Civil Work and Steel Construction

Q1 MMC Plant Building

Civil Work and Steel Construction

Sector

Q1 MMC

Client

Azerbaijan

Region

Done

Project status

About project

About Q1 MMC Plant Building Project

Construction of the Workshop Building: A state-of-the-art facility designed to foster efficient operations and innovation.

Pump Station: A critical component for maintaining the facility’s water infrastructure.

Firefighting System: Advanced and comprehensive safety installations to protect assets and personnel.

Electrical Works: High Voltage (HV), Medium Voltage (MV), and Low Voltage (LV) systems meticulously installed to power progress.

Production Equipment Installation and Setup: Cutting-edge machinery and equipment set up for immediate initiation of operations.

HVAC System: Climate control solutions for creating the ideal working environment. Each element of this project was crafted with precision, ensuring that every aspect of the workshop complex meets the highest standards of quality and functionality. Vien Group LLC is proud to add the Workshop Construction project to our portfolio, reflecting our unwavering commitment to excellence and our client Arge Yapi’s vision.

Office Building: Modern, ergonomic spaces created to optimize productivity and facilitate administrative excellence.

Warehouse: Spacious and strategically designed for optimal logistics and storage solutions.

Transformer Building: Robust infrastructure built to support the electrical needs of the entire complex.

Water Reservoir: Engineered to ensure an ample and reliable water supply, vital for both operations and emergency situations.