Civil Work and Steel Construction
SectorHolcim Cement Plant
ClientAzerbaijan
RegionDone
Project statusScope of work included: Establishing clear goals, scope, and a detailed work breakdown structure to guide the project from inception to completion.
Site Analysis and Environmental Impact Assessment: Performing comprehensive site surveys and environmental assessments to ensure environmental compliance and minimize impact.
Pipeline Design and Engineering: Detailed design and engineering phase, focusing on durability, efficiency, and safety, including materials selection for corrosion resistance.
Excavation and Trenching: Executing precise excavation with minimal environmental disruption.
Welding and Joining Processes: High-quality welding and joining, overseen by experts for robust connections.
Testing, Quality Control, and Safety Measures: Implementing extensive testing, including pressure tests and inspections, to ensure safety and operational integrity.
Site Restoration and Cleanup: Ensuring environmental responsibility through thorough site restoration post-construction.
Final Inspection, Documentation, and Project Handover: Completing the project with a comprehensive review, ensuring all standards and client requirements are met.
Coating Application: Applying protective coatings to prevent corrosion and extend the pipeline’s lifespan.
Qeydiyyatdan uğurla keçdiniz