SATTI

Marine Industrial Solutions

SATTI

Marine Industrial Solutions

Sektor

SATTI

Müştəri

Azərbaycan

Bölgə

Done

Layihə statusu

Layihə haqqında

About SATTI Project

SATTI built in 2016 is a vessel in the Oil service / Platform segment. The vessel has callsign UNDH. Satti is the first platform built entirely in Kazakhstan. It was built over three years using the US technology at two shipyards. The rig is designed for drilling operations in the Caspian Sea at a depth of 80 meters.Kazakhstan’s KMG Drilling & Services and Azerbaijan’s Caspian Drilling Company signed an agreement on drilling wells with the Kazakh “Satti” jack-up rig in the Azerbaijani sector.

The Satti floating drilling unit was delivered to Baku in June 2019 under a memorandum of understanding (MoU) signed by SOCAR President Rovnag Abdullayev and Alik Aydarbayev, chairman of the Management Board of the KazMunayGas. The MoU provides for the upgrade of the Satti rig in Baku and its utilization in SOCAR`s projects in the Azerbaijani sector of the Caspian Sea.

Done works for Satti:

  • Fabrication of Tension ring lifting frame
  • Fabrication of lifting beam
  • Modification of Steel struction
  • Fabrication ofRotary table support beam
  • Drawork beam rainforcement
  • Modification of SETBACK AREA
  • Rainforstment of IRON ROUGHNECK
  • Reinforcment
  • Modification of Foxhole structure
  • Koomy unit structure
  • Fabrication of Fixed platform
  • Fabrication of BOP Spacer Ring
  • Fabrication of Ducting